Call Us: 562-438-7999

Fax: 562-438-7997

Author: blog2019ecg

THE THREE LEVEL DUST CONTROL STRATEGY FOR DEMOLITION PROJECTS

These measures suggest methods for controlling dust and other construction-related airborne materials, which the Contractor should evaluate for applicability in preparing a dust control plan. The specific level of control selected should be based upon Project parameters, including the proximity to occupants of nearby buildings, with the highest level reserved for particularly sensitive populations (e.g., […]

NATIONAL MENU OF BEST MANAGEMENT PRACTICES (BMPs) FOR STORMWATER CONSTRUCTION

Uncontrolled stormwater runoff from construction sites can significantly impact rivers, lakes, and estuaries. Sediment in waterbodies from construction sites can reduce the amount of sunlight reaching aquatic plants, clog fish gills, smother aquatic habitat and spawning areas, and impede navigation. Municipal Separate Storm Sewer System (MS4) permits specify minimum elements and require regulated MS4 owners/operators […]

THE IMPORTANCE OF PLANNING FOR ASBESTOS ABATEMENT DURING DEMOLITION

Asbestos might be banned in USA, but it can still be found in thousands of buildings. During demolition work, building materials are disturbed, cut, crushed, knocked down and demolished. Exactly the type of work that releases deadly asbestos fibers. No other case highlights the risk of asbestos exposure during demolition quite like the World Trade […]