THE THREE LEVEL DUST CONTROL STRATEGY FOR DEMOLITION PROJECTS
These measures suggest methods for controlling dust and other construction-related airborne materials, which the Contractor should evaluate for applicability in preparing a dust control plan. The specific level of control selected should be based upon Project parameters, including the proximity to occupants of nearby buildings, with the highest level reserved for particularly sensitive populations (e.g., […]