San Diego Bridge Double Track Project Bridge Removal

Project Details

Customer: Mid-Coast Corridor Constructors
Location: 4901 Friars Road, San Diego, CA
Completion date: April 2018
Value: $1,500,000.00

Scope of Work

Complete demolition and lead abatement of the 900-foot-long double track bridge that spanned over the San Diego River Channel.

Hale Avenue Resource Recovery Facility (HARRF)

Project Details

Customer: J.F. Shea Construction
Location: 201 North Broadway Escondido, CA 92025
Completion date: December 2017
Value: $934,051

Scope of Work

Demolition and abatement at water treatment plant

PetroChem Ventura California, Oil Refinery EPA Closure Project

Project Details

Customer: USA Petrochem Development I, LLC
Location: Ventura, CA
Completion date: January 2016
Value: $400,110

Scope of Work

Asbestos transite panel abatement and PCB soil contamination (excavation)

Dynegy South Bay Power Plant

Project Details

Customer: Specialized Industrial Services, Inc.
Location: San Diego, CA
Completion date: November 2014
Value: $1,050,000

Scope of Work

ECG is contracted to remove and dispose 1,500 LF of transite pipeline, 3,000 LF of ACM coated oil pipeline. In addition, ECG is assisting SIS with contaminated water remediation, and contaminated soil remediation.

North Vineyard Grade Separation

Project Details

Customer: Ortiz Enterprise
Location: Ontario, CA
Completion date: April 2014
Value: $720,000

Scope of Work

ECG was contracted by Ortiz Enterprises to perform complete asbestos, lead & hazardous materials abatement, and demolition of six (6) hangars and maintenance shops along the north end of the Ontario Airport. ECG’s work is part of the overall grade separation project for the City of Ontario.