COVID-19 and The Impact on Construction Industry

While the world economy has been hit hard by the outbreak of the COVID-19, the construction industry is also facing dramatic and disruptive challenges; such as financial pressure, labor shortages and supply chain issues. 

Practical Advice 

Here is some practical advice for keeping on budget and on time during these unprecedented times:  

1.- Safety. Safety is the overriding imperative on all construction projects. Employers should designate and empower a COVID-19 Compliance Coordinator and post the CDC guidelines onsite. The six-foot social distancing requirement, portable handwashing, wearing gloves, prohibiting carpooling to the jobsite, and closing jobsites to the public are now considered best practices and mandatory expectations for all employers.  

2.- Notice. Give notice early and often! After providing notice, follow up with timely reports, cost information and detailed schedule impact data. Maintain detailed records if you want to preserve any chance of recovering for delay impacts. It is not enough to generally argue that your work has been delayed by COVID-19.  Be specific. 

3.-Collaboration. This is no time for battles or disputes between general contractors and subcontractors. General contractors should ascertain the cash flow status of their subcontractors to determine whether they will be able to perform under the current revenue-starved environment. A key element for project success is that all parties need to work together to identify risks, loss of productivity, schedule impacts, supply chain issues, safety issues, etc.  

4.- Project Financing. “Cash is king,” and if the availability of private and public funding is impaired, work may cease and sureties may be required to take over on payment and performance bonded projects. Conduct adequate due diligence before committing to business relationships. On an ongoing basis, be sure to request and receive adequate assurances of financial ability to pay whenever possible.  

This is intended as general advice and should not be interpreted as legal advice. Each situation is unique and requires specific analysis of relevant contracts, facts and legal obligations. 

We pride ourselves in providing Demolition, Abatement, and Environmental Services you can depend on.  

Contact us to get started on your next project, Call us: 562-438-7999.     

Share

Recent Posts

  • Latest News

THE THREE LEVEL DUST CONTROL STRATEGY FOR DEMOLITION PROJECTS

These measures suggest methods for controlling dust and other construction-related airborne materials, which the Contractor…

1 year ago
  • Latest News

NATIONAL MENU OF BEST MANAGEMENT PRACTICES (BMPs) FOR STORMWATER CONSTRUCTION

Uncontrolled stormwater runoff from construction sites can significantly impact rivers, lakes, and estuaries. Sediment in…

1 year ago
  • Latest News

THE IMPORTANCE OF PLANNING FOR ASBESTOS ABATEMENT DURING DEMOLITION

Asbestos might be banned in USA, but it can still be found in thousands of…

1 year ago
  • Latest News

THE DIFFERENCES BETWEEN DEMOLISHING AND DISMANTLING

If you have an upcoming project you have been thinking you would like to have…

1 year ago
  • Latest News

DEMOLITION AND PIPELINE UTILITES, WHAT TO CONSIDER.

Most people associate excavation with large construction equipment digging giant trenches or big holes. But…

1 year ago
  • Latest News

UNDERGROUND UTILITY DAMAGE

Many various types of utilities are present, buried underneath our streets and roadways - Sanitary…

1 year ago