COVID-19 IMPACT IN CONSTRUCTION INDUSTRY IN CALIFORNIA

California confirmed its first COVID-19 on January 25, 2020 in Orange County. Cases began to emerge across California and on February 14th, San Diego declared the first local health emergency after reporting two cases. Not long after, on March 16th, the Bay Area imposed the first Shelter-in-Place order for the counties of Alameda, Contra Costa, Marin, San Francisco, Santa Clara, Santa Cruz, and San Mateo (CalMatters, 2020). Only three days later, Governor Newsom issued a state-wide Shelter-in-Place order.

In the construction industry, these Shelter-in-Place orders impacted companies differently by region. While construction was deemed essential in most areas of California, Bay Area companies were limited to “public works”, housing, airport operations, oil refining, roads and highways, public transportation, solid waste collection and removal, internet and telecommunications” projects (Bernardi, 2020). These shutdowns, along with new COVID-19 safety guidelines, have taken a toll on construction companies across the state.

As a result, construction companies across California have been forced to quickly adapt to new protocols and regulations. Since certain areas of California have been more impacted by the pandemic, construction companies in those counties have been forced to comply with stricter coronavirus guidelines. The Bay Area has been affected the most by COVID-19 shutdowns and regulations. Then, Los Angeles County and San Diego County, which faced similar restrictions. The least restrictive area to build during the pandemic is the Central Valley, where there were less reported cases. Despite the difference in restrictions, the companies in this case study implemented many of the same COVID-19 protocols throughout all regions. In terms of business risk, the location of each company was not determined to be a factor. These conclusions were determined after conducting two rounds of semi-structured interviews with five companies located in various regions of California. Amid COVID-19 challenges, construction has performed better than most industries.

“After many bumps and bruises, construction has proven to be one of the better performing sectors of the economy over a difficult period,” said Bernard M. Markstein, president and chief economist of Markstein Advisors, who conducted an analysis for ABC of construction’s recent employment performance through September.

On the one hand, the economic uncertainty caused by the pandemic has hit specialty areas of construction hard. Many hospitality, restaurant, retail, entertainment and office projects that were in the works prior to COVID-19 have been put on hold or canceled. Developers have had to recrunch their pro formas on those deals using the pandemic’s new algebra, the common denominator of which is that any project that promotes mass gatherings — such as malls, movie theaters, restaurants, hotels and entertainment venues — gets carried over into the negative column. From that perspective, construction and its furloughed workers need more help — and fast.    

More than a year has passed since the lockdown and the industry has been relatively fortunate. With its essential status, many projects which were underway at the start of the pandemic were permitted to continue, while providing much-needed jobs during a period when many workers in other industries found themselves on unemployment rolls. Now it’s time to reactivate the economy from the core, construction is one of the most important industries in the USA and in Environmental Construction Group (ECG) we are ready, regulation compliant and the best reliable call to get your project back in track.

 We are ECG, We are safety first.

This field definitely needs some expert hands and skill. So, have you decided on what type of project you need? Make sure you research on this for a while before coming up with a decision.

We pride ourselves in providing Construction, Demolition, Abatement and Environmental Services you can depend on. (Concrete cutting, coring, green demolition, disinfection and sterilization cleaning services, asbestos abatement and more)

Contact us to get started on your next project, Call us: 562-438-7999.    

Share

Recent Posts

  • Latest News

THE THREE LEVEL DUST CONTROL STRATEGY FOR DEMOLITION PROJECTS

These measures suggest methods for controlling dust and other construction-related airborne materials, which the Contractor…

1 year ago
  • Latest News

NATIONAL MENU OF BEST MANAGEMENT PRACTICES (BMPs) FOR STORMWATER CONSTRUCTION

Uncontrolled stormwater runoff from construction sites can significantly impact rivers, lakes, and estuaries. Sediment in…

1 year ago
  • Latest News

THE IMPORTANCE OF PLANNING FOR ASBESTOS ABATEMENT DURING DEMOLITION

Asbestos might be banned in USA, but it can still be found in thousands of…

1 year ago
  • Latest News

THE DIFFERENCES BETWEEN DEMOLISHING AND DISMANTLING

If you have an upcoming project you have been thinking you would like to have…

1 year ago
  • Latest News

DEMOLITION AND PIPELINE UTILITES, WHAT TO CONSIDER.

Most people associate excavation with large construction equipment digging giant trenches or big holes. But…

1 year ago
  • Latest News

UNDERGROUND UTILITY DAMAGE

Many various types of utilities are present, buried underneath our streets and roadways - Sanitary…

1 year ago