Planning and Execution of a Commercial Demolition Project

A demolition project is not something that can be done without industry knowledge and equipment. Leave it to the experts to carry out your project from the plumbing and electrical disconnections all the way to the rubble cleanup.

Before hiring a commercial demolition contractor for your next project, it may be beneficial to know how the demolition process works. When you understand the aspects of your demolition project, you will be able to ask the right questions and know what to expect. Then you can have the knowledge to hire the best team for your job.

Each demolition project varies depending on the size of the building. For a commercial demolition, the method involves various steps to e0nsure safety. Demolishing a building is not as simple as hooking up the wrecking balls and going for it. The building is surveyed, and every bit of valuable equipment is taken out and salvaged, piece by piece.

Demolition projects can have different methods depending on the size of the building. In both residential and commercial demolitions, hazardous materials are permanently removed first. This can include asbestos or any dangerous chemicals that are stored in the building.

Demolition Plans

What does demolition mean? Before demolishing a building plans have to be drawn up following the initial survey. These plans are used to carry out the demolition safely and methodically. That is what is demolition. There are some key elements that need to be on the list. These are given below. 

  • Location of the building.
  • The distances from adjacent buildings, roads, structures and schools.
  • The structural support.
  • Method statements for the Demolition of the building.
  • A health and safety plan showing all the measures for the protection of the public.
  • Waste management plan.
  • Plan of the demolition process

Safety Measures

Prior to the beginning of the demolishing a building process all workers must undergo what is demolition  induction training for safety and to understand what does demolition mean? This training will include an emergency toolbox, a discussion of safety measures and methods as well as fire safety training. Workers will also be given training on how to monitor and reduce dust, noise, and vibrations and on what does demolition mean?

The Demolition Process

The demolition process is broken down into parts that are outlined below. Each part has subsequent sections that contain further processes and answer what is demolition. So what does demolition mean? Let’s find out.

Surveying – the initial stage of demolition requires a survey. There is a building survey and a structural survey. These work together to create the foundation for a safe demolishing a building process.

Hazardous Material Removal – Hazardous Material used to create the building, such as asbestos, must be removed before demolishing a building. This protects people and the environment and follows the  demolition plan.

Plan Preparation – a what is demolition plan is then formulated that takes account of where the building is located as well as previous survey data that can contribute to the efficient deconstruction of the edifice.

Safety Measures – everyone involved in the demolition plan will be given full safety training. That includes an induction, emergency plans and methods to reduce noise and dust.

We are ECG, we are safety first.

This field definitely needs some expert hands and skill. So, have you decided on what type of project you need? Make sure you research on this for a while before coming up with a decision.